To ensure scientific reproducibility and agile development, we follow a structured approach to capture requirements using OpenProject. This page explains our workflow and tool usage.
1. Requirement Hierarchy
We use a three-tier hierarchy to bridge the gap between high-level goals and technical implementation.
Epics (The Goal)
-
Definition: High-level functional areas or major project milestones. An Epic represents a complete functionality from start to finish.
-
Example:
Epic: Device Inventory -
Status: Usually In Specification or Specified.
Use Cases / Features (The Activity)
-
Definition: Closed activities describing an interaction between a user and the system. This is where classical RE happens.
-
Documentation: Every Use Case must include a Context Table (Actors, Pre-conditions, Main Scenario) in its description and/or Use-Case diagramms.
-
Example:
[UC-01] Register new device -
Status: In Specification or Specified.
User Stories & Tasks (The Implementation)
-
User Stories: Small, non-breakable functional features.
-
Format: "As a <role>, I want <goal>, so that <benefit>."
-
Example:
US-01: Enter Basic Data
-
-
Tasks: Technical implementation steps or maintenance work.
-
Example:
Task: Create database model
-
Example:
2. Non-Functional Requirements (NFRs)
NFRs (Security, Performance, Data Quality) are essential for research integrity. We capture them based on their scope:
-
Scope-based Capture:
-
As a User Story: If the NFR is a requirement from a user's perspective.
- Example: "As a researcher, I want the system to save my input in less than 2 seconds, so I can continue my work without interruption."
-
As a Feature: If the NFR is a global constraint or technical requirement affecting the entire project or a major component.
- Example: "The system must be immune to SQL injection attacks."
-
As a Task: Only for pure technical implementation steps or one-off "to-dos" that don't describe system behaviour.
-
-
Categorization: Every NFR must be assigned a Category (e.g.,
NFR - Security,NFR - Performance,NFR - Legal). -
Cross-Cutting Concerns: If an NFR applies universally (e.g., "Must follow Institute CI"), it is added to the Definition of Done (DoD) or the parent Use Case description.
3. How to Use the Tools
Versions & Roadmap
-
Every Epic and Use Case must be assigned to a Version (e.g.,
Release 1.0 (MVP)). -
Use the Workpackes or the Roadmap modules to get a high-level overview of our progress and upcoming research milestones.
Backlog (Planning)
-
Use the Backlog module to prioritize work.
-
Product Backlog: All refined User Stories.
-
Sprint Backlog: Stories we committed to for the current development cycle.
Boards (Execution)
-
The Action Board is for daily work.
-
It is filtered to show only User Stories and Tasks.
-
Move cards from
New➡️In Progress➡️Closedto update the team on your status.
Note: Always link your User Story to a parent Use Case and the Use Case to the Epic to maintain traceability!